Project Description

Traffic signal removal, Lincolnshire

Dynniq were required to install antenna on a number of their signal sites. This involved retrofitting an additional cable into each signal pole.

Traditionally this would have involved costly and disruptive civils works to gain cable access to the signal pole. However as all of the signals had previously been installed in the NAL Retention Socket system this allowed Dynniq to utilise the NAL Post Installer. This lifting device was anchored to the socket and enabled an operative to lift the column vertically out of the socket and then rotate and lower it into a horizontal, elevated position.

This allowed for a safe, simple and rapid installation of the additional equipment, with minimal cost and traffic management requirements.

Project: Traffic signal removal, Lincolnshire

Client: Dynniq + Lincolnshire County Council