Duckfoot, Glasgow Signage 2017-11-15T15:41:36+00:00

Project Description

Duckfoot, Glasgow Bus Timetable

Retention Socket Duckfoot Bend

Glasgow City Council chose the NAL Retention Socket System for the installation of electronic bus timetables. RS115 sockets with duckfoot bend were installed which feature a swivel base, rotating a full 360 degrees enabling flexible cabling from any direction.

For security a specialist key is used to open the side chamber of the socket, while a spanner is used to loosen/tighten the retention bolts which hold the column securely in place. The Retention Socket enables the timetables to be demounted for maintenance quickly and efficiently, requiring only minimal TM without the need for disruptive excavations.

RS115 sockets

Project: Bus Timetable Installation

Client: Glasgow City Council